Framing

Framing for new homes, additions and structural changes

NEUE frames new homes, additions, garages and renovations, and opens up rooms by replacing load-bearing walls with engineered beams. Good framing is invisible: walls that are square and plumb, floors that are flat, and a structure that carries the load the engineer designed it for.

Room opened to the studs during a renovation, with new wiring and work lights

Framing we do

  • New home framing: floors, walls, roof systems with trusses or rafters
  • Additions and second storeys, tied into the existing structure
  • Garages and loft suites
  • Load-bearing wall removal with LVL, glulam or steel beams and proper posts down to the footings
  • Renovation framing: new layouts, bulkheads, stair openings
  • Detail framing for shadow gap ceilings, recessed showers and hidden lighting channels

Why framing decides the finish

Trimless drywall, shadow gaps, flush baseboards and large-format tile all expose bad framing. A wall that is a quarter inch out shows as a crooked reveal or a lippage line in tile. We check walls for plumb and floors for flat as we go, and we frame with finishes in mind: blocking for cabinets, grab bars, TVs and heavy fixtures goes in before the drywall.

Removing a load-bearing wall

  1. An engineer sizes the beam and posts, and specifies how the load reaches the foundation.
  2. We get the permit.
  3. Temporary walls carry the floor or roof above while the old wall comes out.
  4. The new beam goes in, flush in the ceiling where possible, with posts and footings as designed.
  5. Inspection, then drywall and finishes.

Envelope at the framing stage

Sheathing, the air barrier, window and door installation and flashing all happen at framing. Done right, they make a house quiet, dry and cheap to heat. We tape and seal the air barrier and flash every opening before cladding goes on.

We work across Northumberland County (Colborne, Cobourg, Port Hope, Brighton), Quinte, Peterborough and the Kawarthas, with Barrie from early 2027.

Questions, answered

Yes. An engineer sizes the beam and posts, we get the permit, support the structure temporarily, install the beam and pass the inspection before finishing.

Yes, for any load-bearing wall. Non-structural partitions usually do not need one, but we confirm before we start.

Ask us. When the schedule allows, we take on framing packages for homeowners and other builders.

Most custom homes take about 4 to 8 weeks to frame and close in, depending on size, roof complexity and weather.

Start

Tell us what you want to build.

An honest budget range at the first meeting. A fixed price, in writing, before work starts.